PAST PROJECT
Work In Progress
Client | Owner | Year | Project Name | Description |
|---|---|---|---|---|
Mutiara Etnik Sdn Bhd | Cenviro Recycling & Recovery Sdn Bhd | 2024 | OPAL & MAVROS | Piping Fabrication & Installation Works |
RP Chemical (M) Sdn Bhd | RP Chemical (M) Sdn Bhd | 2025 | RPCM TAR February 2025 | RPCM TAR February 2025 |
Sankyu (M) Sdn
Bhd | Idemitsu SM (M)
Sdn Bhd | Since 1998 | Manpower
Supply at
Idemitsu, Pasir
Gudang | In Works |
Working Experience - Project
Client | Owner | Year | Project Name | Description |
|---|---|---|---|---|
Toyo Engineering and Construction (M) Sdn Bhd | FPG Oleochemical Sdn Bhd | 2024 | AQUA Project | Supply and Installation Work for AQUA Project |
Toyo Engineering and Construction Sdn Bhd | FPG Oleochemical Sdn Bhd | 2023 | CX-ITB Piping Work | Supply and Installation works for Piping, Painting & Tie-in Works |
PRPC Utilities And
Facilities Sdn Bhd | Petronas Rapid | 2022 | Interconnecting Rebuild
Project | Provision of Piping Erection, Pre Commissioning &
Commissioning Works for P RPC Utilities and
Facilities Sdn Bhd. Interconnecting Rebuild Project |
Toyo Engineering &
Construction Sdn
Bhd | Eastman
Chemical (M)
Sdn Bhd | 2022 | EKM KRP Varnish
Project | Supply and Installation Work for EKM KRP Varnish
Project |
Flexsys Chemicals
(M) Sdn Bhd | Eastman Chemical (M)
Sdn Bhd | 2022 | Nitrogen Line Tie In
Works | Supply and Installation Works for Nitro gen Line Tie In Works |
Toyo Engineering &
Construction Sdn
Bhd | Eastman
Chemical (M)
Sdn Bhd | 2022 | EKM PVOH & RO Project | Supply and Installation Work for EKM PVOH RO
Project |
Edra Engergy Sdn
Bhd | Panglima Power
Sdn Bhd | 2022 | Pedestrain Walkway Car
Park Road Painting
Works | Pedes train Walkway Car Park Road Painting Works
|
Principle Perspective
Engineering Sdn Bhd | Kellogg Asia products
| 2021 | Waste Water Pipe Replacement | Supply, delivery and ins tall waste water pipe replacement |
Toyo Engineering & Construction SB | EastmanChemical (M)Sdn Bhd | 2021 | EKM Resin Project | -Supply and Installation Works for EKM Resin
-Project ErectionWorks |
Rotary Mec (M) Sdn
Bhd | Shell | 2021 | Piping Fabrication &
Installation | Pasir Gudang Installation - Underground to above
Ground Piping Project |
Eversendai Engineering Sdn Bhd | KL Tower 118 | 2021 | Manpower Supply at KL Tower 118
| Manpower Supply at KL Tower 118 |
HQs m Engineering
P te Ltd | ATB Sdn Bhd | 2021 | Internal Rubber Lining & Surface Painting for 4 Unit Tanks
| To rectify and repair Activated Carbon Filter Tank & Quartz Sand Filter Tank |
Working Experience-Shutdown & Maintenance
Client | Owner | Year | Project Name | Description |
|---|---|---|---|---|
Jimah O&M Sdn Bhd | Jimah O&M Sdn Bhd | 2024 | U2 Mini Outage 2024 | MSV Drain Pipe Inspection and Replacement |
RP Chemicals (Malaysia) Sdn Bhd | RP Chemicals (Malaysia) Sdn Bhd | 2024 | 2024 September Mini Shutdown | Main contractor for the shutdown and turnaround |
Man Energy Solutions Malaysia ES Sdn Bhd | GS Paperboard & Packaging Sdn Bhd | 2023 | Manpower Supply in GS Paperboard & Packaging Sdn Bhd | Manpower Supply for Rotating Works |
RP Chemicals (Malaysia) Sdn Bhd | RP Chemicals (Malaysia) Sdn Bhd | 2023 | Turnaround | Main contractor for the shutdown and turnaround. |
Pengerang Power Sdn Bhd | Petronas Rapid | 2022 | Service of Diverter Damper Repair (12MBR) | Supply and Installation Work for Damper |
RP Chemicals (Malaysia) Sdn Bhd | RP Chemicals (Malaysia) Sdn Bhd | 2022 | Major Turnaround | Main contractor for the shutdown and turnaround. |
RP Chemicals (Malaysia) Sdn Bhd | RP Chemicals (Malaysia) Sdn Bhd | 2019 | Major Turnaround | Main contractor for the shutdown and turnaround. |
RP Chemicals (Malaysia) Sdn Bhd | RP Chemicals (Malaysia) Sdn Bhd | 2016 | BM 703 & 302 P TA
Dryer Replacement | Main contractor for the replacement two tubular
dryer and all required modification including civil
and structural work. |
Pahlawan Power Sdn Bhd | Pahlawan Power Sdn Bhd | 2015 | Maintenance | Concrete repair works for pump ho us e.
CW culvert recoating works .
Heat exchanger cleaning. |
Panglima Power
Sdn Bhd | Pahlawan Power Sdn Bhd | 2015 | Shutdown | GT IGV Plenum Bas e P late Ins tall / Patch
By pass Dearator Pump NDF Leak Repair
Steam Turbine Hydro gen Pipe Replacement
Valves / Steam Trap Replacement MI 2015
Supply o f Exhaust Diffuser Materials
|
FPG Oleo chemicals Sdn Bhd | FPG Oleo chemicals Sdn Bhd | 2013 | Maintenance | Replacement o f F-608 bundle.
Replacement o f E703/E716 Heat Exchanger.
|
Petron (M)
Refining &
Marketing Bhd | Petron (M)
Refining &
Marketing Bhd | 2013 | Maintenance | Replacement o f SQ 12 F1001 Crossover Piping.
Additional Defect Piping Works o f SQ 12. |